Anything is possible, They ended up building Westboro Datacenter to completion only because on the books, it was "cheaper" then leaving it as is. Not too long after it had been completed, all servers and machines were hauled out to Durham NC, etc. The entire building was emptied out not too much after that.

So I think anything is possible at this point.

by | Post ID:

My group has had 1 desk for every 2 employees for over 5 years. Its not new. Call centers are not excluded. Why would a call center be excluded when you can take a "call" from home

by | Post ID:

They are not going to shut down 171. No doubt it was on the table. To many people. To many groups to disperse. It would take years. As to someone that posted updates??? The whole roof was replaced as well the parking lot concrete getting ripped up hauled out and replaced. They did change out the frost on the main door to Dell EMC. I highly doubt they would spend the money to do that if it was shutting down. For those who say the work was done before the announcement of Dell buying and it was done last summer? That deal was already in the work Tucci needed his big day payoff. If not he would have got like 160k as apposed to 36 million for leaving.... But yet he is still on as a mentor for Dell

by | Post ID:

Im at 171. My group cant be 100% WFH. Maybe a few on each team rotation but not all. Egans still own the buildings on South St. Big money saver shutting them down. I heard my group might be moving back to 176. Which I dont mind. Hopefully with new equipment if Im still around

by | Post ID:

Like the other comment said, 171 is the only occupied building on South Street that didn't get the external branding and none of the doors or signage on the inside were changed as well. Facilities sent out a message in September that the signage would be done by December but it hasn't, and there's clearly a reason for that. With the "connected workplace" initiative and having 1 desk per every 2 regular employees (sales, call center, and R&D engineers excluded), it's completely realistic they can close it down and shuffle people around the other buildings and push WFH. The only issue will be moving the support center and the lab space.

by | Post ID:

You don't find it interesting that 171 was one of the only buildings that didn't get the full Dell EMC branding on the exterior?

They'll probably tell some people to WFH and move others to 228 (which I'd say is probably only 60-70% full)

by | Post ID:

I highly doubt that. Do you know how many people work in that building?

by | Post ID:

source on the intel? timeline? plans for existing personnel? any info whatsoever?

by | Post ID:

No surprises there. The "upgrades" stopped a year ago, aside from replacing those gawdawful scent diffusers in the restrooms. No more fresh paint on the walls.

Any idea on a timetable?

by | Post ID:

Post a reply

:

Related pages


cabelas in glendale arizonacaldive stock334 793 5000hca holdingswww.primowater.comtwc corporate officein.honeywellshaw layoffwww carbonite comatt cpmintel oregonuniversal technical institute phoenixwilliams energy tulsanov dubai careersat&t u verse locationsintc tickerapple store woodbridge mallnrg green mountainthe layoff chesapeake energybank teller jobs salaryhow much do walgreens store managers makecintas tickervives and buttheadcharlotte russe payrollwells fargo jobs in raleigh ncsalix pharmaceuticals company profilesears downsizingmovado group paramus njbank of americacomwhole foods hinsdalegrainger ciouti technical institute reviewstenneco corporationchevron san ramon office addressvalasisschesapeake energy corporation headquarterscardiovascular consultants castro valley314 577 8000chase layoffssolar winds austin txruby tuesday nashvillewalmart wwe figuresfresenius kgaafact set research systemsitt esi stockhoneywell plymouth mnconvergys incverizon district manager salarykidz aventura mallmolina healthcare nmmaxus realty trustpatterson dental salarygeneral dynamics layoffsgrainger az locationscabelas careerlockheed martin colorado locationsapple sherman oaksteradata australiateradata acquisitionvmware scope in indiawalmart denver quebecsaint alphonsus regional medical centergiant eagle employment opportunitiesverizon fios reviews njjp morgan houston txcabelas doorbusterthermo fisher scientific carlsbad cajcpenny westlandatt stores houstonnational oilwell vargoapple store at alderwood mallsperry oil and gasshengdatech incruby tuesday lake cityat&t stores hours of operationorbitz worldwide chicagous bancorp tickerhalliburton victoria txgogo tickerbecker dickinsonsams cllub